PROJECT
|
END USER
|
CLIENT
|
TYPE OF CONTRACT
|
PROJECT DESCRIPTION
|
Dec-19
|
ADNOC Onshore
|
Fox
|
Bid engineering Support
|
Detail Engineering and Procurement Assistance Works For Installation Of Ammonia Converter R-1501 In F-1
|
Mar-19
|
ADNOC Onshore
|
MUC
|
Project Management Services
|
Project Management Services including Engineering Services and Procurement assistance for Call-Out Contract For Bu Hasa Wellhead Remote Monitoring and Control Implementation and Construction Of Oil Network Over Pressure Protection – Long Term
|
Jan, 2019
|
NHRDC, Srilanka
|
Training and Development Services
|
Hiring of Resource Persons for Conducting Training Programmes Lectures - Leadership, Citizen Focus, Innovative and Change Agent, Effective Communication, Teamwork, Strategic and System Thinking, Emotional Intelligence, Motivation, Project Management, Computer Application on Project Management, Time Management, Cost Management, Resource Management .
|
Jan, 2019
|
Amaravathi Development Corporation Ltd
|
Fox
|
Bid engineering Support
|
Design Engineering, documentation and approvals pertaining to Process, Electrical, Instrumentation and Telecom for the following list of works
1. Intake-well-cum-raw water pump house of capacity 17050 m3/hr (2W+1S)
2. Water treatment plant capacity of 8261 m3/hr (190 MLD)
3. 64 ML capacity underground clear water reservoir-cum-Pumping station (10W+1S,
2W+1S, 2W+1S)
4. 7 Nos of cushion tanks (ELSRs)
5. 8 nos of SUGRs cum Pump houses
6. Water supply network (WDC) on continuous pressurized supply system
7. RMS, BMS, integration of full water supply system
|
Jan, 2019
|
EIL and L&T
|
Fox
|
Secondment Services
|
Multi-disciplinary Modelers requirments with the specialisation of PDMS, SP3D and AutoCAD
|
Oct, 2018
|
Toyo
|
Fox
|
Post Engineering and Audit Support
|
Post Engineering services and Support for Audit for KNM - TAIF Sulphur Recovery Unit
|
Sep, 2018
|
Government of Turkinistan
|
Bid Engineering
|
Design and Construction New Onshore Pumping Station & Seawater Desalination Plant Output of 15,000 M3/day For Turkmenbashi Complex of Oil Refineries on Terms of Turnkey.
|
Sep, 2018
|
Johannesburg Water Private Limited
|
Training and Development Services
|
Training Services for Basic Principles of Open Channel Flow Metering Training Course and Advanced Programmable Logic Controller (PLC) Training .
|
July, 2018
|
KOC
|
Fox
|
Bid engineering Support
|
Engineering activities required for the supply of the materials and for the construction of the new plant New Gas Sweetening Facility (NGSF) located in West Kuwait at Booster Station (BS) 171, consisting of the following units.
1. 2 identitical trains of Gas Sweetening Unit (GSU)
2. 2 identical trains of Sulphur Removal Unit (SRU)
3. 1 train of Tail Gas Treatment Unit (TGT)
4. 1 train of Acid Gas Enrichment (AGE)
Utilities:
5. Chiller unit
6. Auxillary Boiler
7. Hot Oil
|
July, 2018
|
National Oil Company Of Croatia
|
Bid engineering
|
Engineering, Material Delivery And Technical Assistance During Installation of Live Loading System On Heat Exchenagers 321-E-019 & 321-E-022in Rijeka Refinery
|
July, 2018
|
Oman Oil Refineries And Petroleum Industries Company
|
Bid engineering
|
EPCC - Engineering, Procurement, Construction, Commissioning for (Allen Bradley & Siemens PLC HMI Upgrade) R1
|
Nov, 2017
|
Singhealth
|
Maintenance Contract
|
Annual Maintenance Contract for Electrical and Instrument Systems
|
Nov, 2017
|
TransLink
|
Engineering Serivices
|
Professional Engineering and Writing Serivces
|
Nov, 2017
|
TransLink
|
Engineering Serivices
|
Engineering Consulting Services for Coordinating Design Role
|
Dec,2016
|
Argentina
|
Procurement supply
|
Supply of Bare Copper wire and Tinned copper wire
|
Nov,2016
|
Uorganics (Pty) Ltd
|
Bid Engineering
|
Engineering and Procurement activities for Organic Rankine Cycle
|